International Grants

·         FP7/ 2007-2013, FP7-REGPOT-2009-1, Grant agreement no. 245479, CEMCAST - “Centre of Excellence for Modern Composites Applied in Aerospace and Surface Transport Infrastructure” - Capacities/Research Potential, Call FP7- REGPOT-2009-1, Unlocking and developing the research potential of research entities in the EU’s convergence regions and outermost regions.
Project duration: 01.04.2010-31.03.2013
In this project I was a leader of the work package "Dynamics of Composite and Smart Structures".

·         MTKD-CT-2004-014058, Transfer of Knowledge FP6 European Union Project, "Modern Composite Materials Applied in Aerospace, Civil and Mechanical Engineering: Theoretical Modelling and Experimental Verification"
Project duration: 01.01.2005-31.12.2009
I was a leader of the task ""Dynamics of Composite Structures".

·         WAR/992/117, British/Polish Joint Research Collaboration Programme, untitled “Chaos in Cutting Process”.
Project duration: 1997-1999
The project was supported by British Council and Polish State Committee for Scientific Research (KBN).
I was a leader (from a Polish side) of this project.

·         Grant No.02.06774-3 from FAPESP-São Paulo, Brazil, "Research of  Nonlinear and Non-Ideal Slewing Structures with Applications to Engineering Science" 
Project duration: 21.09-12.10.2002
The project was supported by Brazilian Foundation FAPESP

·         European COST Action P4 “Non-linear Dynamics in Mechanical Processing”
Project duration: 1999-2002
In this project I was nominated to the Management Committee by Polish Ministry for Scientific Research as a representative of Poland.  My participation in this action was also financially supported by national grant, which let me complete high quality experimental equipment enabling to measure  dynamical forces in cutting processes.

·         Project contract 49/NN/06, "Study of Drift in Latch Systems”, MAGNA CLOSURES of America, Inc. 39600 Lewis Drive, Suite 2000, Novi, MI 48377, USA
Project duration: 2006-2007

 National Grants

·         Grant DEC-2012/07/B/ST8/03931 from the Polish National Science Centre, "Nonlinear vibrations of composite rotating beams with embedded active elements"
Project duration: 11.07.2013-10.07.2016

·         Grant from Polish State Committee for Scientific Research, N502 049 31/1449, "Vibration analysis of discrete and continuous autoparametric systems made of modern materials
Project duration: 2006-2009

·         Grant from Polish State Committee for Scientific Research Nr T07C 017 24, "Analysis of nonlinear oscillations in a metal elements cutting process" Project duration: 2003-2005

·         Grant from Structural Funds in the Operational Programme - Innovative Economy (IE OP) financed from the European Regional Development Fund - Project "Modern material technologies in aerospace industry", Nr POIG.01.01.02-00-015/08-00, task ZB1 "High Speed Machining of Aviation Materials"
Project duration: 2009-2014

·         Grant from Structural Funds in the Operational Programme - Innovative Economy (IE OP) financed from the European Regional Development Fund - Project "Modern material technologies in aerospace industry", Nr POIG.01.01.02-00-015/08-00, task ZB14 "Inteligent materials and embedded complex systems."
Project duration: 2009-2014 

·         Grant from Polish State Committee for Scientific Research Nr 1001/T07/99/16, "Regular vibrations, bifurcations and chaos in parametrically and self-excited systems"
Project duration: 1998-2001   

The theoretical results are strongly supported by experimental investigations, important for practical engineering application and technology.

Industrial Projects

·         Contract UM-K-340/08/140(96/NN/08), PZL Swidnik SA, "Development and implementation of new generation material technologies for the main rotor blades of a helicopter PZL-W-3A Sokol (Falcon)"
Project duration: 2009-2013

·         Contract 2011 with Zakłady Azotowe Puławy SA, "Inspection tests of spherical tank 190B2 - strain-gauge tests and stress-strain analysis of the tank and three selected pillars"
Project duration: 2011

·         Contract 26/NN/2010 with Zakłady Azotowe Puławy SA, "Inspection strain-gauge tests and stress-strain analysis of the spherical tank 190B3 No. 2421 (33838)"
Project duration: 2010

·         Contract 37/NN/2009 with Zakłady Azotowe Puławy SA, "Inspection tests of spherical tank 190 B1 No. RZU3/11/09/313/AN/09"
Project duration: 2009


Back